Albion Z Section Cladding Rail Double span butt system

< Back to Z Section Cladding Rail

The double span joint system is not as efficient in load carrying capacity when compared to the sleeved system, however, when load criteria allows choice of system then this is the more cost effective, saving on component parts and site erection time.


Sleeves are only required at the single span end bay connection

 

 

 

 

For more information, refer to pages 8 – 9 of our online Z Purlin brochure or contact our technical team.